Littleton's roofing rules at a glance
| Topic | Rule |
|---|---|
| Permit trigger | Permit for 1 square (100 sq ft) or more in aggregate; up to 100 sq ft in any 365 days is a repair |
| Ice barrier | Required: ASTM D1970 ice barrier at least 2 ft inside the exterior wall line at the eaves of all conditioned structures |
| Inspection | Mid-roof inspection at 25–75% of covering installed with all underlayment and flashing in place; pre-roof inspections no longer required |
| Deck | Spaced-board decks with gaps over 1/2 in need a 3/8 in (minimum) panel overlay and a sheathing-nailing inspection |
| Fastening and flashing | Six nails per asphalt shingle minimum; galvanized drip edge |
| Permit display | Posted where it is visible from the street |
| Contractor | Valid City of Littleton contractor license required (class not named in the policy) |
Littleton publishes its roofing rules as a single, dated policy, which makes them easy to quote back to a roofer. It was first issued on 14 May 2020 and revised for the third time on 12 June 2023.
The 1-square, 365-day threshold
Most metro cities set a repair threshold per job. Littleton's is different in two ways. First, the line is 1 square or more, so exactly 100 sq ft already needs a permit, where Thornton's "more than 1 square" would not. Second, the policy defines a repair as up to 100 sq ft in any 365 days, so it is cumulative.
Use the permit checker with Littleton selected, and add up every repair from the past year before you enter the area.
What Policy 20-005 requires on the roof
Ice barrier on conditioned buildings
Littleton requires an ASTM D1970 self-adhering ice barrier at the eaves, extending at least 2 ft inside the exterior wall line, on all conditioned structures. That puts it with Centennial and against Lakewood, Thornton and Denver's 2015 guideline, which do not require it. An unheated detached garage is not a conditioned structure; ask your roofer how the policy applies to yours.
Six nails per shingle
The policy sets six nails per asphalt shingle as a minimum. Check that the shingle on your quote is installed to its maker's instructions as well; where those ask for more, the higher requirement applies.
Spaced-board decks
Older homes often have plank (spaced-board) sheathing. Where the gaps exceed 1/2 in, the policy requires an overlay of at least 3/8 in panels and a sheathing-nailing inspection before the roof goes on. If your house predates plywood decking, ask whether the quote includes this overlay, because it can only be found on tear-off.
Drip edge
Galvanized drip edge is required. It protects the deck edge and fascia from the water that runs off the shingles.
The mid-roof inspection
- Permit postedVisible from the street before work starts.
- Tear-off and deckOverlay and sheathing-nailing inspection if boards are spaced over 1/2 in.
- Mid-roofAll underlayment, ice barrier and flashing on; 25–75% of the covering installed.
- FinalRoof complete; permit closed.
Pre-roof inspections are no longer required, so the mid-roof visit is the only time an inspector sees the ice barrier and underlayment. The policy also requires a ladder extending 3 ft above the eave for the inspector. Ask your roofer to photograph the ice barrier and nailing at mid-roof and send you the photos.
License and the investigative fee
Colorado does not license roofers at the state level, so a roofer working in Littleton needs a valid City of Littleton contractor license, whatever licenses it holds in Denver or Aurora. If work starts without a permit or without that license, the city adds an investigative fee equal to the permit cost, and it may issue a stop-work order or a summons.
The fee is charged on the permit, which in practice means the property. Make the roofer's Littleton license number and the permit number part of the written contract that C.R.S. 6-22-103 already requires, and check both before the tear-off. License classes across the metro are on roofing licenses in the Denver metro.
How Littleton differs from its neighbors
| Rule | Littleton | Centennial | Lakewood |
|---|---|---|---|
| Repair without permit | Under 100 sq ft, counted over 365 days | Under 100 sq ft | Under 100 sq ft |
| Ice barrier | Required (conditioned buildings) | Required on all roofs | Not required |
| Mid-roof inspection | Yes, in person | Yes, every reroof | Photos; none for asphalt shingles |
The full five-city comparison, with Denver and Thornton, is in the permits guide.
Hail in Littleton's three counties
Littleton's city limits cross Arapahoe, Jefferson and Douglas counties. NOAA's Storm Events Database lists 158 hail reports in Arapahoe, 151 in Jefferson and 142 in Douglas County for 2016–2025; reports are county-level, so these are not Littleton-only counts.
Show the data as a table
| Year | Reports |
|---|---|
| 2016 | 8 |
| 2017 | 4 |
| 2018 | 25 |
| 2019 | 28 |
| 2020 | 4 |
| 2021 | 12 |
| 2022 | 5 |
| 2023 | 44 |
| 2024 | 22 |
| 2025 | 6 |
Show the data as a table
| Year | Reports |
|---|---|
| 2016 | 14 |
| 2017 | 20 |
| 2018 | 16 |
| 2019 | 15 |
| 2020 | 2 |
| 2021 | 15 |
| 2022 | 2 |
| 2023 | 46 |
| 2024 | 9 |
| 2025 | 12 |
Show the data as a table
| Year | Reports |
|---|---|
| 2016 | 28 |
| 2017 | 5 |
| 2018 | 12 |
| 2019 | 22 |
| 2020 | 5 |
| 2021 | 18 |
| 2022 | 2 |
| 2023 | 36 |
| 2024 | 8 |
| 2025 | 6 |
Counted by us from the NOAA NCEI Storm Events details files, retrieved 2026-10-20. Method on Denver metro hail history.
What to ask a roofer in Littleton
The questions below cover Littleton's own license, permit and inspection rules. Metro-wide answers on deductibles, permits and contracts are in the Denver roofing questions page.
- What is your City of Littleton contractor license number?
- Will the permit be posted where it is visible from the street before work starts?
- Does the quote include ASTM D1970 ice barrier 2 ft inside the wall line, and six nails per shingle?
- If the deck is spaced boards, is the 3/8 in overlay priced, or how will it be priced once found?
- Will you send me photos from the mid-roof inspection and proof the final passed?
Common questions
Do I need a permit to repair my roof in Littleton?
Yes if you replace 1 square (100 sq ft) or more of roof covering in aggregate. Littleton's Policy 20-005 treats up to 100 sq ft in any 365 days as a repair, so several small repairs in a year can add up to a permit.
Does Littleton require ice and water shield?
Yes. Policy 20-005 requires an ASTM D1970 ice barrier extending at least 2 ft inside the exterior wall line at the eaves of all conditioned structures.
What happens if a roofer starts without a permit in Littleton?
The city adds an investigative fee equal to the permit cost when work starts without a permit or without a valid Littleton contractor license, and stop-work orders or a summons are possible.
Does Littleton still do pre-roof inspections?
No. Policy 20-005 says pre-roof inspections are no longer required. A mid-roof inspection is required at 25–75% of the covering installed, with all underlayment and flashing in place.