The stages at a glance
Before day one: contract and permit
Colorado law sets the first step. Before any roofing work begins, the roofer must give the owner a written contract signed by both parties, stating: the scope of work and materials; approximate dates; the approximate cost based on the damage known at signing; the roofer's physical address, email and phone; its surety and liability insurer, if any; its cancellation and deposit-refund policy, including full refund of a deposit if the owner rescinds within 72 hours of signing; the owner's rescission right under 6-22-104; and, when insurance pays, that the roofer cannot pay, waive or rebate the deductible.
The face of the contract must state, in bold type, that the roofer holds the owner's payments in trust and will not use them for any other purpose until materials have been delivered to the site or a majority of the work has been performed. In practice that means the deposit pays for materials arriving at your house, not for the roofer's last job.
Sources: C.R.S. 6-22-103, Contracts for roofing services; C.R.S. 6-22-103(2), read 2026-10-20.
If an insurance claim is paying, a second clock applies. Where the contract is paid from insurance proceeds, the owner may rescind, in whole or in part, within 72 hours after receiving the insurer's written notice that the claim is denied. Supplemental work that was reasonably foreseeable at signing is not a ground. Notice goes to the roofer's physical address. The roofer must return payments within 10 days, keeping only the value of work actually performed in a workmanlike manner.
Next comes the permit. Every city in our permit comparison requires one for a full reroof, normally pulled by the roofer under its city license or registration. Ask for the permit number before the tear-off and look it up on the city portal. Lakewood's 2026 handout also notes that the permit valuation there must include all labor and materials for tear-off and installation, so the valuation on the permit should match your contract.
Preparing the house
A tear-off sends nails, granules and old shingles off every edge of the roof. Most of the preparation is about what is under the eaves and what is inside the attic.
- Move cars out of the driveway and garage, and agree where the dumpster or trailer will sit.
- Clear patio furniture, grills and planters from the drip line; cover anything that cannot move.
- Cover stored items in the attic; tear-off shakes dust and debris through the deck.
- Take pictures off walls that share framing with the roof; hammering travels.
- Agree on a contact who can answer the phone during inspections and deck decisions.
- Ask how the crew will find nails in the lawn and driveway afterward.
Tear-off and the deck
The old roofing comes off. In Centennial, replacement removes all layers to the deck. Denver's guideline allows two layers at most, so a house that already has two cannot take a third; it goes back to the deck. Denver requires a building permit once work covers more than 10 percent of the roof, and allows two layers at most, so a third means a full tear-off to the deck. Its roofing guidance also sets shingle wind ratings by location, from 90 mph east of Federal Boulevard to 110 mph at Kipling.
Source: City and County of Denver, "Denver Residential Roofing Guidelines" (revised 28 August 2015). Denver has since adopted its 2025 code, so confirm the detail with CPD (marked verify).
Tear-off is the only time anyone sees the decking, so this is when surprises appear: soft or delaminated sheathing around chimneys and valleys, old spaced boards on older homes, or rot from a long-running leak.
- Spaced boards: Littleton's Policy 20-005 requires a panel overlay of at least 3/8 inch, with a sheathing-nailing inspection, where gaps between boards exceed half an inch.
- New sheathing: Thornton inspects all newly installed roof sheathing before it is covered.
- Structure: Denver's 2025 Residential Code raised the ground snow load from 35 to 43 psf. That is a structural number, not a shingle one, but it is why the deck, its fastening and its drainage get checked on a tear-off.
Dry-in: underlayment, ice barrier and flashing
Once the deck is sound, the roof is "dried in": underlayment across the deck, drip edge at the edges, flashing at walls, chimneys and valleys, and ice barrier where it is required or specified. This is the layer that keeps water out if a shingle is lost, and it is what the mid-roof inspection is there to see.
| City | Ice barrier | Other dry-in detail |
|---|---|---|
| Littleton | Required: ASTM D1970 barrier at least 2 ft inside the exterior wall line at the eaves of conditioned buildings | Galvanized drip edge |
| Centennial | Required on all roofs | All layers removed to the deck |
| Lakewood | Not required | Drip edge required at eaves; Class A fire-rated coverings |
| Thornton | Only if the shingle maker's instructions specify it | Drip edge at eaves and rakes |
| Denver | Not required at eaves (2015 guideline, verify) | Slopes under 1:12 need modified rolled roofing or an EPDM-type membrane |
A code minimum is not the same as good practice on a north-facing eave that holds snow; see the ice-dam guide.
The mid-roof inspection
Most metro cities want to see the roof half-done, when the underlayment and flashing are visible and some shingles are on to check nailing. The window is written precisely:
- Littleton: 25–75% of the covering installed, with all underlayment and flashing in place. Pre-roof inspections are no longer required.
- Centennial: on every reroof permit, with tear-off done, underlayment complete and 25–75% of the new material on. A missed mid-roof has to be cleared another way.
- Thornton: all old covering removed, drip edge and valley flashing installed, 75–100% of underlayment and 40–75% of shingles on. Since 28 August 2025, it is done by texted photos showing the address, underlayment, valley material, starter course, flashing, the six-nail pattern and the shingle wrapper.
- Lakewood: photo inspections through eTRAKiT, with no mid-roof inspection for asphalt shingles.
Sources: Littleton Policy 20-005; Centennial reroof page; Thornton Roofing Standards (9-12-25); Lakewood 2026 handout. Read 2026-10-20.
Shingles, vents and ridge
After the mid-roof passes, the covering is completed: shingles to the ridge, hip-and-ridge caps, pipe boots, vents and any skylight or chimney flashing. Two details are worth watching.
- Nailing. Littleton requires at least six nails per asphalt shingle, and Thornton checks the six-nail pattern in its photo inspection. High or too-few nails are a common cause of blow-offs on the west side of the metro.
- Matching the permit. Thornton's inspectors check the shingle wrapper against the product on the permit application. Keep a wrapper yourself; it identifies the product for the warranty.
Thornton's standards also recommend having a licensed plumbing or mechanical contractor check dryer and gas vent connections below the roof line after a reroof, because the city does not inspect them and they can be knocked loose during the work.
Final inspection and close-out
A final inspection is required for every permitted roof in the cities we track. Thornton does it by FaceTime or Google Meet; the inspector checks the shingles, nailing, underlayment, flashing, drip edge, valleys and ventilation. In Thornton's words, shingles "shall be self-sealed" and all flashings "installed and complete".
Close-out is the paperwork you keep:
- Passed finalThe permit shows as finaled on the city portal.
- InvoiceMatches the contract, with any deck sheets itemized.
- WarrantyProduct names, registration confirmation, workmanship terms.
- PhotosTear-off, deck, dry-in and finished slopes, dated.
Only then pay the balance. If insurance is paying on a replacement-cost policy, this file is also what releases the withheld depreciation; see roof insurance claims.
Inspection steps by city
| City | Inspections | Source |
|---|---|---|
| Denver | Not stated in the 2015 guideline we could read | City and County of Denver, Residential Roofing Guidelines (rev. 28 Aug 2015) (verify) |
| Littleton | Mid-roof inspection at 25–75% of covering installed with all underlayment and flashing in place; pre-roof inspections no longer required | City of Littleton, Policy #20-005, Roof Covering and Installation Requirements (5/14/2020, 3rd rev. 6/12/2023) |
| Centennial | Mid-roof inspection on every reroof permit (tear-off done, underlayment complete, 25–75% of new material on) | City of Centennial Building Division, Residential Roof Repairs and Re-Roofing |
| Lakewood | Photo inspections uploaded to eTRAKiT; no mid-roof inspection for asphalt shingles | City of Lakewood, Roofing and Re-roofing handout (2026 edition) |
| Thornton | Sheathing (if installed), mid-roof by texted photos and a virtual final inspection (since 28 Aug 2025) | City of Thornton Building Inspection Division, Roofing Standards (last update 9-12-25) |
City-by-city detail is on the Littleton, Centennial, Lakewood and Thornton pages.
After the crew leaves
- Walk the yard, driveway and gutters for nails and debris, and check the gutters were not bent by ladders.
- Look in the attic on the next sunny day for daylight at penetrations, and after the next rain for any damp spots.
- Check that bath and kitchen exhaust fans still vent outdoors.
- Save the close-out file with your house records.
If something is wrong, notify the roofer in writing under the workmanship terms in your contract. The warranty guide explains what each warranty covers.
Common questions
How long does a roof replacement take in Denver?
The roofing work itself on a typical house is short, but the job runs from permit to final inspection, and the inspection schedule depends on the city and the season. Ask your roofer for a written start date and an expected completion date; C.R.S. 6-22-103 requires approximate dates in the contract.
Do I need to be home during a roof replacement?
You do not need to be on the roof, but you or someone you trust should be reachable. Thornton's virtual inspections, for example, need an onsite contact with a phone, and decisions about rotten decking come up mid-job.
What happens if the crew finds rotten decking?
Damaged sheathing has to be replaced before underlayment goes on. Ask in advance how the contract prices it (per sheet, usually), and ask for photos before any sheet is replaced. In Thornton, new sheathing is inspected before it is covered.
When do I pay for a new roof in Colorado?
C.R.S. 6-22-103(2) requires the contract to state in bold that your payments are held in trust until materials are delivered or most of the work is done. Pay the balance after the final inspection passes, not before.
Will the city inspect my new roof?
Yes, when the job is permitted. Littleton and Centennial require a mid-roof inspection; Lakewood uses photo inspections and skips the mid-roof for asphalt shingles; Thornton uses texted photos for the mid-roof and a video call for the final.